CRANE RIGGING & PANEL ASSEMBLY

Because Polar Plank wall panels arrive pre-built with factory insulation, precision bucks, and interlocking joinery, an experienced crew with a mobile crane can stand and lock your weather envelope in just 1 to 2 days.

HOURS 00:00 – 02:00

STEP 01: SILL PREP & CRANE SETUP

Level the subfloor deck, verify corner diagonals, lay factory EPDM sill seal gaskets, and position the boom truck or mobile crane with stable outrigger pads.

HOURS 02:00 – 06:00

STEP 02: CORNER & WALL PANEL RUN

Fly the master corner panel first. Interlock perimeter panels sequentially using tongue-and-groove joints, driving structural fasteners through engineered pre-drilled chases.

HOURS 06:00 – 09:00

STEP 03: RIDGE BEAM & RAFTER SET

Lift the pre-cut heavy timber ridge beam into pocket notches. Crane flies and drops pre-cut roof rafters directly onto top-plate rafter seats.

HOURS 09:00 – 12:00

STEP 04: SHEATHING & DRIED-IN LOCK

Fasten roof sheathing, roll felt and ice-and-water shield membrane along eaves. In a single working day, your building envelope is closed to rain and snow.

WATCH THE TIMELAPSE

12-HOUR CABIN ASSEMBLY IN ACTION

Watch a complete 24' × 28' Polar Plank cabin package erected from subfloor deck to standing insulated walls in under 12 hours on the Kenai Peninsula.